?

Glisser pour tourner le dossier · molette pour zoomer

← Archives de la Fondation

Peu commune

SCP-8274

The Monarch Butterfly

Classe
Keter
Accréditation
Niveau 2

Procédures de confinement

A constant perimeter of no less than 50 personnel must be kept surrounding the entrance to SCP-8274. All mining operations within 70 km of the site are to be shut down with the explanation that the terrain is unstable.

Attending staff must follow a monthly schedule referred to as the Ecdysis Timeline. Testing must be carried out during an Ecdysis sanctioned excursion into SCP-8274. New staff will be briefed personally on the details of the Ecdysis Timeline.

Description

SCP-8274-B is a physically impossible cavernous structure located at Site-39. Beneath the entrance stretches approximately 84 kilometers of winding and interconnected pyroducts which exhibit signs of spatial distortion. Their layout would imply that several tunnels overlap and occupy the same physical space as each other, while others should extrude from the mountain face, but do not. Following a certain path through these tunnels leads to a hollowed shaft referred to as ‘the elevator’ by attending staff. At the bottom of the shaft lies a semi-spherical basin measuring approximately 5 km in diameter. The hollowed sides of the basin feature a large etched mural. The bulk of the mural is made up of unknown scripts. Through analysis these scripts have been determined to be made up of four different unknown languages. Two of the present languages have been found in excerpts at other archaeological sites. All of these excerpts have been extracted from their sites for research and study. Attempts to decipher the text are being led by warehouse.aic with the aid of the head linguist at Site-39. Alongside the text are many images, several of which have been identified as depictions of known SCP anomalies and PoIs.

Attempts to record images of the basin result in the present equipment breaking and becoming unusable before any footage can be captured. For this reason, computer analysis of the text must be conducted on recreations drawn by attending staff. Due to the size of the basin, this is being done incrementally.

THE REMAINDER OF THE DESCRIPTION HAS BEEN CLASSIFIED BY ORDER OF THE O5 COUNCIL

Staff Personal Notepad:

Dr. James Talum

Journal Entry #1: I was just issued a reassignment to Site-39. They moved me here from Site-98 and told me to bring the first semi-functional prototype of the Æ Suit with me. My goodbyes to the development team were painfully short lived.

It also turns out that I'll be at Site-39 indefinitely. I was told that it's part of some team building exp…

Texte : iammuffin · CC BY-SA 3.0 · article original