?

Glisser pour tourner le dossier · molette pour zoomer

← Archives de la Fondation

Commune

SCP-9642

No Further Action Required

Classe
Euclid
Accréditation
Niveau 3
Forces d'intervention
Beta-7

Procédures de confinement

SCP-9642 is contained within a 10m x 10m x 10m reinforced Class-V isolation vault at Site-19.

To prevent neural anchoring, personnel assignments to SCP-9642 are strictly limited to 7-day rotations. No individual may hold primary research responsibility for more than one rotation annually.

Due to documented infohazardous properties, personnel reviewing SCP-9642 files are limited to 15 minutes of exposure and must undergo immediate mandatory psychological screening for cognitive fatigue, apathy, and executive dysfunction.

Description

SCP-9642 is an amorphous, dense grey polymer mass, originally recorded at a baseline of 40 kg. The object is chemically and biologically inert. Current data indicates it expands in volume by siphoning kinetic and thermal energy from its immediate surroundings, concurrently projecting a cognitohazard that induces profound abulia in nearby human subjects.

Prior to formal classification, SCP-9642 was designated "Anomaly-46-B."

EVIDENCE FILE: Ethics Committee Tribunal 26-A

SUBMITTED BY: Investigator F. Woods

CONTEXT: The following internal correspondence and incident logs were recovered during the post-breach audit of Sector 4. They are entered into the official record unredacted as primary evidence of systemic procedural negligence.

From:

To:

CC:

Subject:

ArisEllis@scp.int

S-19Maint_Logistics@scp.int

none

WORK ORDER - Locker 42-B Capacity Issue

Maintenance,

I am submitting a work order for containment locker 42-B. The provisional anomaly inside is exhibiting undocumented changes. It is expanding in volume by approximately 2 mm per week, and its density is increasing.

More concerning is a localized atmospheric effect. The air around the locker feels noticeably heavier, and I am logging a severe drop in ambient temperature. Additionally, it is becoming difficult to perform routine testing in the immediate vicinity without experiencing extreme fatigue. I am requesting an immediate review of the locker and a transfer to a high-capacity, isolated unit before the anomaly outgrows its current boundaries.

Dr. Aris Ellis

Foundation Junior Researcher

Date: 12 October 2026

From:

To:

CC:

Subject:

S-19Maint_Logistics@scp.int

ArisEllis@scp.int

none

RE: WORK ORDER - Locker 42-B Capacity Issue

Request denied.

We reviewed the sensor data. A 2 mm variance is within normal seasonal thermal parameters, and the structural integrity of Locker 42-B is well within established safety margins. Sector 4 personnel are currently logging extended shifts; localized fatigue is standard. The object i…

Texte : ActuallyClue · CC BY-SA 3.0 · article original